De Construction Solutions carried out a structural inspection before producing a report ahead of demolition across five areas of an industrial facility with live areas operating alongside redundant plant.
Together with general technical demolition engineering support, the project also entailed pre-weakening and protection mat designs, as well as lifting formation checks for large cranes.